• The wire coil is exited from the horizontally cleaned coil compartment.
• The coil is produced using the wire received.
• Loading is carried out by forklift or crane.
• Continuous operation is achieved by welding the wire end to the wire start.
| Material | Min. Wire Dia. Ø mm |
Max. Wire Dia. Ø mm |
Mak. Speed m/s |
Max. Pay-Off Speed During Coil Change m/s |
Machine Dimensions (W x D x H) m |
|
|---|---|---|---|---|---|---|
| SYV | Al, Al alloys |
9,5 | 11,5 | 3 | 0,5 | 1,1 x 2,5 x 2,2 |